skip navigation Wisconsin Department of Transportation
Wisconsin Department of Transportation Logo
Plans and Projects
 
DMV | Safety | Travel | Plans & Projects | State Patrol | Doing Business | Programs for Local Gov't

US 51 corridor

Central segment

Schedule

Map

Public involvement

Contacts

US 51 central segment - Stoughton Road

The US 51 central segment includes 10 miles of US 51 (Stoughton Road) from Terminal Drive/Voges Road in the village of McFarland to Token Creek Parkway in the town of Burke. 

This portion of US 51 has three major components: 

  • Needs assessment
    Completed in June 2003, the needs assessment determined the existing roadway's condition and how future traffic volumes will impact traffic flow. The study indicated there was sufficient need to study potential improvement alternatives. 
  • Short-term improvements
    The needs assessment identified a number of short-term improvements that could mitigate existing problems in the corridor. A WisDOT corridor management team is working to identify and implement these improvements on an ongoing basis. In addition, the city of Madison is making improvements in the corridor. 
  • Alternatives analysis
    This analysis will involve development of long-term solutions to address the problems identified in the needs assessment and completion of an environmental impact statement (EIS). The alternatives are being developed and selected with public input.


Photo of congested traffic on Stoughton Road (US 51).

 

Other US 51 segments:

North segment

South segment

 


DMV | Safety | Travel | Plans & Projects | State Patrol | Doing Business | Programs for Local Gov't

Air | Bicycles | Bus/transit | Cars | Motorcycles | Pedestrian | Rail | Trucks | Waterways

Home | News | About Us | Research & Library | A-Z Index | Site Survey